91&SB110-405 Conn over Dominguez Chan Off-Ramp

Fair

Los Angeles County, California · 07-LA-110-9.15-LA · Structure no. 53 2558K

Built
1985
40 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
308 ft
3 main spans
Daily traffic
8,560
2022 count
Owner
State
State Highway Agency

About this bridge

91&SB110-405 Conn over Dominguez Chan Off-Ramp is a prestressed concrete continuous stringer/multi-beam or girder carrying 91&SB110-405 Conn over Dominguez Chan Off-Ramp in Los Angeles County, California. It was built in 1985, so it is 40 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,560 vehicles a day, roughly 3% of them trucks, projected to reach 13,452 by 2044. The structure is 308 ft (93.9 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries91&SB110-405 Conn
CrossesDominguez Chan Off-Ramp
Location07-LA-110-9.15-LA
RouteInterstate 110
Coordinates33.86219, -118.28559
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length308 ft (93.9 m)
Longest span102 ft (31.1 m)
Deck width28 ft (8.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,560 (2022)
Projected traffic13,452 by 2044
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 91&SB110-405 Conn over Dominguez Chan Off-Ramp built?

It was built in 1985, making it 40 years old in 2025.

What condition is 91&SB110-405 Conn over Dominguez Chan Off-Ramp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does 91&SB110-405 Conn over Dominguez Chan Off-Ramp carry?

About 8,560 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is 91&SB110-405 Conn over Dominguez Chan Off-Ramp?

The structure is 308 ft (93.9 m) long with a longest span of 102 ft (31.1 m) and a deck 28 ft wide.

Who owns 91&SB110-405 Conn over Dominguez Chan Off-Ramp?

It is owned by the State Highway Agency.