US Bridges

Fair OAKS-E210 Hov over I 210 Median

Good

Los Angeles County, California · 07-LA-210-R25.30-PAS · Structure no. 53 2782

Built
1996
29 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
298 ft
4 main spans
Daily traffic
680
2015 count
Owner
State
State Highway Agency

About this bridge

Fair OAKS-E210 Hov over I 210 Median is a concrete continuous box beam or girders - multiple carrying Fair OAKS-E210 Hov over I 210 Median in Los Angeles County, California. It was built in 1996, so it is 29 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 680 vehicles a day, roughly 3% of them trucks, projected to reach 969 by 2042. The structure is 298 ft (90.9 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFair OAKS-E210 Hov
CrossesI 210 Median
Location07-LA-210-R25.30-PAS
RouteInterstate 210
Coordinates34.15171, -118.15036
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length298 ft (90.9 m)
Longest span72 ft (21.9 m)
Deck width25 ft (7.5 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic680 (2015)
Projected traffic969 by 2042
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fair OAKS-E210 Hov over I 210 Median built?

It was built in 1996, making it 29 years old in 2025.

What condition is Fair OAKS-E210 Hov over I 210 Median in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Fair OAKS-E210 Hov over I 210 Median carry?

About 680 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is Fair OAKS-E210 Hov over I 210 Median?

The structure is 298 ft (90.9 m) long with a longest span of 72 ft (21.9 m) and a deck 25 ft wide.

Who owns Fair OAKS-E210 Hov over I 210 Median?

It is owned by the State Highway Agency.