US Bridges

Maple ST over I-210 & I-710 Conn

Good

Los Angeles County, California · 07-LA-210-R24.58-PAS · Structure no. 53 2254

Built
1975
50 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
953 ft
3 main spans
Daily traffic
1,200
2015 count
Owner
State
State Highway Agency

About this bridge

Maple ST over I-210 & I-710 Conn is a prestressed concrete continuous box beam or girders - multiple carrying Maple ST over I-210 & I-710 Conn in Los Angeles County, California. It was built in 1975, so it is 50 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,200 vehicles a day, roughly 1% of them trucks, projected to reach 1,708 by 2042. The structure is 953 ft (290.6 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMaple ST
CrossesI-210 & I-710 Conn
Location07-LA-210-R24.58-PAS
RouteCity Street 0Q486
Coordinates34.15207, -118.15355
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3 (+5 approach)
Design loadHS 20
Structure length953 ft (290.6 m)
Longest span161 ft (49.1 m)
Deck width46 ft (14 m)
Roadway width36 ft (11 m)
Vertical clearance over deck24 ft (7.4 m)

Traffic and service

Average daily traffic1,200 (2015)
Projected traffic1,708 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Maple ST over I-210 & I-710 Conn built?

It was built in 1975, making it 50 years old in 2025.

What condition is Maple ST over I-210 & I-710 Conn in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Maple ST over I-210 & I-710 Conn carry?

About 1,200 vehicles per day (2015 count), of which roughly 1% are trucks.

How long is Maple ST over I-210 & I-710 Conn?

The structure is 953 ft (290.6 m) long with a longest span of 161 ft (49.1 m) and a deck 46 ft wide.

Who owns Maple ST over I-210 & I-710 Conn?

It is owned by the State Highway Agency.