I-8 WB over 4th ST (giss Parkway)
FairYuma County, Arizona · 1.7 MI N JCT US 95 · Structure no. 01323
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected January 2025
- Type
- Box Beam or Girders - Single or Spread
- Concrete Continuous
- Length
- 204 ft
- 2 main spans
- Daily traffic
- 15,040
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-8 WB over 4th ST (giss Parkway) is a concrete continuous box beam or girders - single or spread carrying I-8 WB over 4th ST (giss Parkway) in Yuma County, Arizona. It was built in 1969, so it is 56 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,040 vehicles a day, roughly 15% of them trucks, projected to reach 15,050 by 2041. The structure is 204 ft (62.2 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-8 WB over 4th ST (giss Parkway) built?
It was built in 1969, making it 56 years old in 2025.
What condition is I-8 WB over 4th ST (giss Parkway) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does I-8 WB over 4th ST (giss Parkway) carry?
About 15,040 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is I-8 WB over 4th ST (giss Parkway)?
The structure is 204 ft (62.2 m) long with a longest span of 102 ft (31.1 m) and a deck 50 ft wide.
Who owns I-8 WB over 4th ST (giss Parkway)?
It is owned by the State Highway Agency.