SR 87 over UPRR
FairPinal County, Arizona · N of Junc I-10 · Structure no. 02934
- Built
- 2018
- 7 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 357 ft
- 3 main spans
- Daily traffic
- 3,852
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 87 over UPRR is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 87 over UPRR in Pinal County, Arizona. It was built in 2018, so it is 7 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,852 vehicles a day, roughly 20% of them trucks, projected to reach 3,862 by 2042. The structure is 357 ft (108.8 m) long and 112 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 87 over UPRR built?
It was built in 2018, making it 7 years old in 2025.
What condition is SR 87 over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does SR 87 over UPRR carry?
About 3,852 vehicles per day (2022 count), of which roughly 20% are trucks.
How long is SR 87 over UPRR?
The structure is 357 ft (108.8 m) long with a longest span of 135 ft (41.1 m) and a deck 112 ft wide.
Who owns SR 87 over UPRR?
It is owned by the State Highway Agency.