US Bridges

Selma HWY over Canal

Fair

Pinal County, Arizona · 02.2 MI N JCT I 8 · Structure no. 01161

Built
1966
59 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
128 ft
2 main spans
Daily traffic
310
2022 count
Owner
State
State Highway Agency

About this bridge

Selma HWY over Canal is a steel continuous stringer/multi-beam or girder carrying Selma HWY over Canal in Pinal County, Arizona. It was built in 1966, so it is 59 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 310 vehicles a day, roughly 5% of them trucks, projected to reach 320 by 2042. The structure is 128 ft (39 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSelma HWY
CrossesCanal
Location02.2 MI N JCT I 8
RouteState Highway 10
StateArizona
Coordinates32.8505, -111.6886
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating44 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length128 ft (39 m)
Longest span62 ft (18.9 m)
Deck width31 ft (9.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic310 (2022)
Projected traffic320 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Selma HWY over Canal built?

It was built in 1966, making it 59 years old in 2025.

What condition is Selma HWY over Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Selma HWY over Canal carry?

About 310 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Selma HWY over Canal?

The structure is 128 ft (39 m) long with a longest span of 62 ft (18.9 m) and a deck 31 ft wide.

Who owns Selma HWY over Canal?

It is owned by the State Highway Agency.