IRR BIA RTE 88 over Wash
FairPinal County, Arizona · 4.2 KM N - Az 87/87A JCT · Structure no. 0000H57614B0803
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected January 2023
- Type
- Slab
- Concrete Continuous
- Length
- 61 ft
- 3 main spans
- Daily traffic
- 97
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 88 over Wash is a concrete continuous slab carrying IRR BIA RTE 88 over Wash in Pinal County, Arizona. It was built in 1950, so it is 75 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 97 vehicles a day, roughly 2% of them trucks, projected to reach 120 by 2043. The structure is 61 ft (18.5 m) long and 22 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 88 over Wash built?
It was built in 1950, making it 75 years old in 2025.
What condition is IRR BIA RTE 88 over Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does IRR BIA RTE 88 over Wash carry?
About 97 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is IRR BIA RTE 88 over Wash?
The structure is 61 ft (18.5 m) long with a longest span of 20 ft (6 m) and a deck 22 ft wide.
Who owns IRR BIA RTE 88 over Wash?
It is owned by the Bureau of Indian Affairs.