Houghton Road over Tanque Verde Creek
FairPima County, Arizona · 0.1 MI N JCT Speedway Bl · Structure no. 07760
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,100 ft
- 11 main spans
- Daily traffic
- 12,959
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Houghton Road over Tanque Verde Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Houghton Road over Tanque Verde Creek in Pima County, Arizona. It was built in 1989, so it is 36 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,959 vehicles a day, roughly 8% of them trucks, projected to reach 12,969 by 2042. The structure is 1,100 ft (335.3 m) long and 50 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Houghton Road over Tanque Verde Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is Houghton Road over Tanque Verde Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Houghton Road over Tanque Verde Creek carry?
About 12,959 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Houghton Road over Tanque Verde Creek?
The structure is 1,100 ft (335.3 m) long with a longest span of 100 ft (30.5 m) and a deck 50 ft wide.
Who owns Houghton Road over Tanque Verde Creek?
It is owned by the County Highway Agency.