US Bridges

Bonanza Ave over Este Wash

Good

Pima County, Arizona · 0.5 MI S JCT Bdwy Blvd · Structure no. 08451

Built
1972
53 years old
Condition
Good
inspected December 2023
Type
Culvert
Steel
Length
22 ft
3 main spans
Daily traffic
1,000
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Bonanza Ave over Este Wash is a steel culvert carrying Bonanza Ave over Este Wash in Pima County, Arizona. It was built in 1972, so it is 53 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,010 by 2042. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBonanza Ave
CrossesEste Wash
Location0.5 MI S JCT Bdwy Blvd
RouteCity Street 0
StateArizona
Coordinates32.22856, -110.78022
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans3
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span5 ft (1.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2022)
Projected traffic1,010 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bonanza Ave over Este Wash built?

It was built in 1972, making it 53 years old in 2025.

What condition is Bonanza Ave over Este Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Bonanza Ave over Este Wash carry?

About 1,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Bonanza Ave over Este Wash?

The structure is 22 ft (6.7 m) long with a longest span of 5 ft (1.5 m).

Who owns Bonanza Ave over Este Wash?

It is owned by the City or Municipal Highway Agency.