SR 202L EB over 52nd Street
GoodMaricopa County, Arizona · 4.04 MI E JCT I10 & S · Structure no. 02210
- Built
- 1992
- 33 years old, rebuilt 2012
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 342 ft
- 3 main spans
- Daily traffic
- 88,914
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 202L EB over 52nd Street is a prestressed concrete continuous box beam or girders - single or spread carrying SR 202L EB over 52nd Street in Maricopa County, Arizona. It was built in 1992 and reconstructed in 2012, so it is 33 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 88,914 vehicles a day, roughly 6% of them trucks, projected to reach 88,924 by 2042. The structure is 342 ft (104.2 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 202L EB over 52nd Street built?
It was built in 1992, making it 33 years old in 2025. It was reconstructed in 2012.
What condition is SR 202L EB over 52nd Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SR 202L EB over 52nd Street carry?
About 88,914 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR 202L EB over 52nd Street?
The structure is 342 ft (104.2 m) long with a longest span of 140 ft (42.7 m) and a deck 85 ft wide.
Who owns SR 202L EB over 52nd Street?
It is owned by the State Highway Agency.