L 202 EB over Ramp B(52nd ST Off Rmp)

Good

Maricopa County, Arizona · 3.89 MI E JCT I 10 & · Structure no. 02208

Built
1992
33 years old, rebuilt 2012
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
154 ft
3 main spans
Daily traffic
88,914
2022 count
Owner
State
State Highway Agency

About this bridge

L 202 EB over Ramp B(52nd ST Off Rmp) is a prestressed concrete continuous box beam or girders - single or spread carrying L 202 EB over Ramp B(52nd ST Off Rmp) in Maricopa County, Arizona. It was built in 1992 and reconstructed in 2012, so it is 33 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 88,914 vehicles a day, roughly 6% of them trucks, projected to reach 88,924 by 2042. The structure is 154 ft (46.9 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesL 202 EB
CrossesRamp B(52nd ST Off Rmp)
Location3.89 MI E JCT I 10 &
RouteState Highway 202
StateArizona
Coordinates33.4549, -111.9718
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.1 US tons
Inventory rating54 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length154 ft (46.9 m)
Longest span70 ft (21.3 m)
Deck width85 ft (25.9 m)
Roadway width82 ft (25 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic88,914 (2022)
Projected traffic88,924 by 2042
Trucks6%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was L 202 EB over Ramp B(52nd ST Off Rmp) built?

It was built in 1992, making it 33 years old in 2025. It was reconstructed in 2012.

What condition is L 202 EB over Ramp B(52nd ST Off Rmp) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does L 202 EB over Ramp B(52nd ST Off Rmp) carry?

About 88,914 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is L 202 EB over Ramp B(52nd ST Off Rmp)?

The structure is 154 ft (46.9 m) long with a longest span of 70 ft (21.3 m) and a deck 85 ft wide.

Who owns L 202 EB over Ramp B(52nd ST Off Rmp)?

It is owned by the State Highway Agency.