US Bridges

SR 202L WB over Ramp B(52nd ST Off Ramp)

Good

Maricopa County, Arizona · 3.89 MI E JCT I 10 & · Structure no. 02209

Built
1992
33 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
154 ft
3 main spans
Daily traffic
80,163
2022 count
Owner
State
State Highway Agency

About this bridge

SR 202L WB over Ramp B(52nd ST Off Ramp) is a prestressed concrete continuous box beam or girders - single or spread carrying SR 202L WB over Ramp B(52nd ST Off Ramp) in Maricopa County, Arizona. It was built in 1992, so it is 33 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80,163 vehicles a day, roughly 6% of them trucks, projected to reach 80,173 by 2042. The structure is 154 ft (46.9 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 202L WB
CrossesRamp B(52nd ST Off Ramp)
Location3.89 MI E JCT I 10 &
RouteState Highway 202
StateArizona
Coordinates33.455, -111.9716
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating94 US tons
Inventory rating56 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length154 ft (46.9 m)
Longest span70 ft (21.3 m)
Deck width71 ft (21.7 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80,163 (2022)
Projected traffic80,173 by 2042
Trucks6%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 202L WB over Ramp B(52nd ST Off Ramp) built?

It was built in 1992, making it 33 years old in 2025.

What condition is SR 202L WB over Ramp B(52nd ST Off Ramp) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SR 202L WB over Ramp B(52nd ST Off Ramp) carry?

About 80,163 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SR 202L WB over Ramp B(52nd ST Off Ramp)?

The structure is 154 ft (46.9 m) long with a longest span of 70 ft (21.3 m) and a deck 71 ft wide.

Who owns SR 202L WB over Ramp B(52nd ST Off Ramp)?

It is owned by the State Highway Agency.