US Bridges

79th Avenue over 7 10 Eb-Wb & Drain Chnl

Fair

Maricopa County, Arizona · 7 MI W of JCT I 17 · Structure no. 02187

Built
1990
35 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
471 ft
6 main spans
Daily traffic
2,424
2022 count
Owner
State
State Highway Agency

About this bridge

79th Avenue over 7 10 Eb-Wb & Drain Chnl is a prestressed concrete stringer/multi-beam or girder carrying 79th Avenue over 7 10 Eb-Wb & Drain Chnl in Maricopa County, Arizona. It was built in 1990, so it is 35 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,424 vehicles a day, roughly 10% of them trucks, projected to reach 2,434 by 2042. The structure is 471 ft (143.6 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries79th Avenue
Crosses7 10 Eb-Wb & Drain Chnl
Location7 MI W of JCT I 17
RouteCity Street 0
StateArizona
Coordinates33.4623, -112.2295
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating37 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length471 ft (143.6 m)
Longest span131 ft (39.9 m)
Deck width81 ft (24.6 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deck34 ft (10.5 m)

Traffic and service

Average daily traffic2,424 (2022)
Projected traffic2,434 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 79th Avenue over 7 10 Eb-Wb & Drain Chnl built?

It was built in 1990, making it 35 years old in 2025.

What condition is 79th Avenue over 7 10 Eb-Wb & Drain Chnl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does 79th Avenue over 7 10 Eb-Wb & Drain Chnl carry?

About 2,424 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is 79th Avenue over 7 10 Eb-Wb & Drain Chnl?

The structure is 471 ft (143.6 m) long with a longest span of 131 ft (39.9 m) and a deck 81 ft wide.

Who owns 79th Avenue over 7 10 Eb-Wb & Drain Chnl?

It is owned by the State Highway Agency.