US Bridges

75th Avenue over I 10

Good

Maricopa County, Arizona · 6.4 MI West of JCT I 10 · Structure no. 01843

Built
1984
41 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
343 ft
2 main spans
Daily traffic
25,700
2022 count
Owner
State
State Highway Agency

About this bridge

75th Avenue over I 10 is a prestressed concrete continuous box beam or girders - single or spread carrying 75th Avenue over I 10 in Maricopa County, Arizona. It was built in 1984, so it is 41 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,700 vehicles a day, roughly 6% of them trucks, projected to reach 25,710 by 2042. The structure is 343 ft (104.5 m) long and 133 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries75th Avenue
CrossesI 10
Location6.4 MI West of JCT I 10
RouteCity Street 0
StateArizona
Coordinates33.4621, -112.2206
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length343 ft (104.5 m)
Longest span169 ft (51.5 m)
Deck width133 ft (40.5 m)
Roadway width116 ft (35.4 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic25,700 (2022)
Projected traffic25,710 by 2042
Trucks6%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 75th Avenue over I 10 built?

It was built in 1984, making it 41 years old in 2025.

What condition is 75th Avenue over I 10 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does 75th Avenue over I 10 carry?

About 25,700 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is 75th Avenue over I 10?

The structure is 343 ft (104.5 m) long with a longest span of 169 ft (51.5 m) and a deck 133 ft wide.

Who owns 75th Avenue over I 10?

It is owned by the State Highway Agency.