US Bridges

IRR BIA RTE 3 over Navajo Point Draw

FairPosted for load

Graham County, Arizona · 43.1 KM E of Coolidge Dam · Structure no. 00000000000H199

Built
1929
96 years old
Condition
Fair
inspected December 2024
Type
Tee Beam
Concrete
Length
132 ft
5 main spans
Daily traffic
120
2024 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 3 over Navajo Point Draw is a concrete tee beam carrying IRR BIA RTE 3 over Navajo Point Draw in Graham County, Arizona. It was built in 1929, so it is 96 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.

It carries about 120 vehicles a day, roughly 2% of them trucks, projected to reach 140 by 2044. The structure is 132 ft (40.2 m) long and 23 ft wide. If it were closed, the detour would be 67.1 mi (108 km).

CarriesIRR BIA RTE 3
CrossesNavajo Point Draw
Location43.1 KM E of Coolidge Dam
RouteFederal Lands Road 3
StateArizona
Coordinates33.15919, -110.1395
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusPosted for other load-capacity restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32.8 US tons
Inventory rating24.1 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadH 15
Structure length132 ft (40.2 m)
Longest span28 ft (8.5 m)
Deck width23 ft (7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic120 (2024)
Projected traffic140 by 2044
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed67.1 mi (108 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 3 over Navajo Point Draw built?

It was built in 1929, making it 96 years old in 2025.

What condition is IRR BIA RTE 3 over Navajo Point Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does IRR BIA RTE 3 over Navajo Point Draw carry?

About 120 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is IRR BIA RTE 3 over Navajo Point Draw?

The structure is 132 ft (40.2 m) long with a longest span of 28 ft (8.5 m) and a deck 23 ft wide.

Who owns IRR BIA RTE 3 over Navajo Point Draw?

It is owned by the Bureau of Indian Affairs.