US Bridges

Leslie Canyon RD over Desert Wash

FairPosted for load

Cochise County, Arizona · 22.8 MI N JCT SR 80 · Structure no. 08108

Built
1950
75 years old
Condition
Fair
inspected February 2023
Type
Arch - Deck
Concrete
Length
28 ft
1 main span
Daily traffic
70
2021 count
Owner
County
County Highway Agency

About this bridge

Leslie Canyon RD over Desert Wash is a concrete arch - deck carrying Leslie Canyon RD over Desert Wash in Cochise County, Arizona. It was built in 1950, so it is 75 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 70 vehicles a day, projected to reach 80 by 2041. The structure is 28 ft (8.5 m) long and 24 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesLeslie Canyon RD
CrossesDesert Wash
Location22.8 MI N JCT SR 80
RouteCounty Highway 0
StateArizona
Coordinates31.6516, -109.4739
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckOther
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span27 ft (8.2 m)
Deck width24 ft (7.4 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic70 (2021)
Projected traffic80 by 2041
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Leslie Canyon RD over Desert Wash built?

It was built in 1950, making it 75 years old in 2025.

What condition is Leslie Canyon RD over Desert Wash in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Leslie Canyon RD over Desert Wash carry?

About 70 vehicles per day (2021 count).

How long is Leslie Canyon RD over Desert Wash?

The structure is 28 ft (8.5 m) long with a longest span of 27 ft (8.2 m) and a deck 24 ft wide.

Who owns Leslie Canyon RD over Desert Wash?

It is owned by the County Highway Agency.