Girder and Floorbeam System bridges in District of Columbia
Main girders along the bridge with transverse floorbeams carrying the deck, typical of larger steel bridges. District of Columbia has 23 of them, 8.8% of its bridges. Nationally this type accounts for 0.8% of all bridges.Compare states for this type.
- Girder and Floorbeam System bridges
- 23
- Poor condition
- 4%
- 1 bridges
- Average age
- 61.1 yrs
- Combined length
- 4 mi
Busiest girder and floorbeam system bridges in District of Columbia
Top 23 by daily traffic| Bridge | County | Location | Built | Type | Length | Daily traffic | Condition |
|---|---|---|---|---|---|---|---|
| Southeast Frwy over CSX RR Nj & Va Ave No. 1109 | District of Columbia | SE Frwy over Virginia Ave | 1964 | Girder and Floorbeam System | 1,458 ft | 252,800 | Fair |
| New York Avenue over Anacostia River No. 0076 | District of Columbia | New York Av-Anacostia Riv | 1953 | Girder and Floorbeam System | 538 ft | 131,500 | Fair |
| T. Roosevelt Brid over Pot River & Potomac No. 1200(MAIN) | District of Columbia | TR Bridge-Potomac River | 1964 | Girder and Floorbeam System | 1,762 ft | 95,000 | Poor |
| Anacostia Freeway over Penn RR Yards S.E. No. 0505 | District of Columbia | Anacost Frwy over RR | 1960 | Girder and Floorbeam System | 2,116 ft | 87,100 | Fair |
| East Capitol ST over Anacostia River & Pa No. 0233 | District of Columbia | Anacostia River at E Cap | 1955 | Girder and Floorbeam System | 1,798 ft | 42,100 | Good |
| Whitehurst Frwy over K Street N.W. No. 0032 | District of Columbia | Georgetown Waterfront NW | 1949 | Girder and Floorbeam System | 4,172 ft | 40,000 | Fair |
| 14th Street S.W. over Street Car Terminal No. 0021 | District of Columbia | 14th & C Streets S.W | 1942 | Girder and Floorbeam System | 275 ft | 38,000 | Fair |
| Southwest Freeway over South Capitol Street No. 1104(RAMP G) | District of Columbia | S Capitol ST & SW Fre | 1964 | Girder and Floorbeam System | 640 ft | 24,000 | Fair |
| Chain Bridge over Potomac R. & C&o No. 0001 | District of Columbia | Over Potomac River N.W. | 1937 | Girder and Floorbeam System | 1,383 ft | 20,600 | Good |
| Benning Rd-Wb over Kenilworth Ave-B&o R No. 0503(WB) | District of Columbia | Benning RD over B&o R | 1961 | Girder and Floorbeam System | 470 ft | 18,968 | Fair |
| 9th Street N.W. over Convention Center Parkin No. 0252 | District of Columbia | 9th Street N.W. | 2003 | Girder and Floorbeam System | 1,327 ft | 17,000 | Fair |
| Ramp D to Rt 50 over Little R & Gw Pkwy No. 1200(RAMP D) | District of Columbia | T Roosevelt Br. to Rt. 50 | 1964 | Girder and Floorbeam System | 654 ft | 13,000 | Fair |
| Ramp E to Gw Pkwy over Little River No. 1200(RAMP E) | District of Columbia | T Roosevelt Br Tp Gw Pkwy | 1964 | Girder and Floorbeam System | 428 ft | 13,000 | Fair |
| K Street Ramp over K Street Exit Ramp No. 0032-2 | District of Columbia | K Street | 1949 | Girder and Floorbeam System | 268 ft | 12,500 | Fair |
| K Street Ramp over K Street Entrance Ramp No. 0032-3 | District of Columbia | K Street N.W. | 1949 | Girder and Floorbeam System | 238 ft | 12,500 | Fair |
| Southwest Freeway over South Capitol Street No. 1104(RAMP G-D) | District of Columbia | S Capitol ST & SW Fre | 1964 | Girder and Floorbeam System | 138 ft | 11,000 | Fair |
| Arlington Blvd (u. over Gwmp (sb) & Boundary Cha No. 3300014P0000000 | District of Columbia | 1.6 Miles North of I-395. | 1946 | Girder and Floorbeam System | 267 ft | 10,600 | Fair |
| Klingle Road N.W. over Rock Creek & Beach D No. 0026-1 | District of Columbia | Rock Creek & Beach DR | 1947 | Girder and Floorbeam System | 237 ft | 9,000 | Fair |
| Klingle Road N.W. over Rock Creek No. 0026-3 | District of Columbia | Over Rock Creek | 1947 | Girder and Floorbeam System | 133 ft | 9,000 | Fair |
| M Street N.W. over D.C. Convention Center No. 0251 | District of Columbia | M Street N.W. | 2005 | Girder and Floorbeam System | 386 ft | 8,500 | Fair |
| L Street N.W. over D.C. Convention Center No. 0250 | District of Columbia | L Street N.W. | 2003 | Girder and Floorbeam System | 494 ft | 8,000 | Fair |
| Lenfant Promenade over D Street S.W. No. 1114 | District of Columbia | 10th Street S.W. | 1961 | Girder and Floorbeam System | 729 ft | 7,500 | Fair |
| 2nd Street SE over CSX RR No. 0598 | District of Columbia | _ | 2018 | Girder and Floorbeam System | 41 ft | 4,700 | Good |
Counties with the most
| District of Columbia | 23 |
Looking for a specific bridge? Use the search on the District of Columbia page and filter by type.