Southwest Freeway over South Capitol Street

Fair

District of Columbia, District of Columbia · S Capitol ST & SW Fre · Structure no. 1104(RAMP G)

Built
1964
61 years old, rebuilt 1991
Condition
Fair
inspected March 2023
Type
Girder and Floorbeam System
Steel
Length
640 ft
7 main spans
Daily traffic
24,000
2018 count
Owner
State
State Highway Agency

About this bridge

Southwest Freeway over South Capitol Street is a steel girder and floorbeam system carrying Southwest Freeway over South Capitol Street in District of Columbia, District of Columbia. It was built in 1964 and reconstructed in 1991, so it is 61 years old, younger than the District of Columbia average of 63.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 24,000 vehicles a day, roughly 5% of them trucks, projected to reach 30,000 by 2028. The structure is 640 ft (195.1 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSouthwest Freeway
CrossesSouth Capitol Street
LocationS Capitol ST & SW Fre
RouteInterstate 695
Coordinates38.88087, -77.00887
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating70 US tons
Inventory rating42 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length640 ft (195.1 m)
Longest span221 ft (67.4 m)
Deck width36 ft (10.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck15 ft (4.5 m)

Traffic and service

Average daily traffic24,000 (2018)
Projected traffic30,000 by 2028
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Southwest Freeway over South Capitol Street built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1991.

What condition is Southwest Freeway over South Capitol Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Southwest Freeway over South Capitol Street carry?

About 24,000 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Southwest Freeway over South Capitol Street?

The structure is 640 ft (195.1 m) long with a longest span of 221 ft (67.4 m) and a deck 36 ft wide.

Who owns Southwest Freeway over South Capitol Street?

It is owned by the State Highway Agency.