I-80 Wbl over Divide Road
FairPosted for loadUinta County, Wyoming · Evanston - Green River · Structure no. AMV
- Built
- 1960
- 65 years old, rebuilt 1994
- Condition
- Fair
- inspected July 2023
- Type
- Slab
- Concrete Continuous
- Length
- 68 ft
- 3 main spans
- Daily traffic
- 7,901
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-80 Wbl over Divide Road is a concrete continuous slab carrying I-80 Wbl over Divide Road in Uinta County, Wyoming. It was built in 1960 and reconstructed in 1994, so it is 65 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,901 vehicles a day, roughly 49% of them trucks, projected to reach 11,061 by 2043. The structure is 68 ft (20.6 m) long and 51 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80 Wbl over Divide Road built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1994.
What condition is I-80 Wbl over Divide Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does I-80 Wbl over Divide Road carry?
About 7,901 vehicles per day (2024 count), of which roughly 49% are trucks.
How long is I-80 Wbl over Divide Road?
The structure is 68 ft (20.6 m) long with a longest span of 25 ft (7.6 m) and a deck 51 ft wide.
Who owns I-80 Wbl over Divide Road?
It is owned by the State Highway Agency.