US Bridges

I-80 Ebl over Divide Road

FairPosted for load

Uinta County, Wyoming · Evanston - Green River · Structure no. AMU

Built
1960
65 years old, rebuilt 1994
Condition
Fair
inspected July 2023
Type
Slab
Concrete Continuous
Length
68 ft
3 main spans
Daily traffic
7,563
2024 count
Owner
State
State Highway Agency

About this bridge

I-80 Ebl over Divide Road is a concrete continuous slab carrying I-80 Ebl over Divide Road in Uinta County, Wyoming. It was built in 1960 and reconstructed in 1994, so it is 65 years old, older than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 7,563 vehicles a day, roughly 48% of them trucks, projected to reach 10,588 by 2043. The structure is 68 ft (20.6 m) long and 51 ft wide.

CarriesI-80 Ebl
CrossesDivide Road
LocationEvanston - Green River
RouteInterstate 80
StateWyoming
Coordinates41.27601, -110.80128
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating28.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length68 ft (20.6 m)
Longest span25 ft (7.6 m)
Deck width51 ft (15.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,563 (2024)
Projected traffic10,588 by 2043
Trucks48%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$69,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 Ebl over Divide Road built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1994.

What condition is I-80 Ebl over Divide Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does I-80 Ebl over Divide Road carry?

About 7,563 vehicles per day (2024 count), of which roughly 48% are trucks.

How long is I-80 Ebl over Divide Road?

The structure is 68 ft (20.6 m) long with a longest span of 25 ft (7.6 m) and a deck 51 ft wide.

Who owns I-80 Ebl over Divide Road?

It is owned by the State Highway Agency.