I-25 Service Road over Rock Creek
PoorPlatte County, Wyoming · Wheatland South · Structure no. ADQ
- Built
- 1948
- 77 years old
- Condition
- Poor
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 82 ft
- 3 main spans
- Daily traffic
- 153
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Service Road over Rock Creek is a steel continuous stringer/multi-beam or girder carrying I-25 Service Road over Rock Creek in Platte County, Wyoming. It was built in 1948, so it is 77 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 153 vehicles a day, roughly 7% of them trucks, projected to reach 214 by 2043. The structure is 82 ft (25 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Service Road over Rock Creek built?
It was built in 1948, making it 77 years old in 2025.
What condition is I-25 Service Road over Rock Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2025.
How much traffic does I-25 Service Road over Rock Creek carry?
About 153 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is I-25 Service Road over Rock Creek?
The structure is 82 ft (25 m) long with a longest span of 30 ft (9.1 m) and a deck 44 ft wide.
Who owns I-25 Service Road over Rock Creek?
It is owned by the State Highway Agency.