US Bridges

8th Street over Canal No 2

FairPosted for load

Platte County, Wyoming · Wheatland · Structure no. DQW

Built
1950
75 years old
Condition
Fair
inspected November 2024
Type
Slab
Concrete
Length
23 ft
1 main span
Daily traffic
138
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

8th Street over Canal No 2 is a concrete slab carrying 8th Street over Canal No 2 in Platte County, Wyoming. It was built in 1950, so it is 75 years old, older than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 138 vehicles a day, roughly 11% of them trucks, projected to reach 193 by 2043. The structure is 23 ft (7 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries8th Street
CrossesCanal No 2
LocationWheatland
RouteCity Street 470-8
StateWyoming
Coordinates42.04708, -104.95265
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.5 US tons
Inventory rating33.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length23 ft (7 m)
Longest span22 ft (6.8 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic138 (2024)
Projected traffic193 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$7,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 8th Street over Canal No 2 built?

It was built in 1950, making it 75 years old in 2025.

What condition is 8th Street over Canal No 2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does 8th Street over Canal No 2 carry?

About 138 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is 8th Street over Canal No 2?

The structure is 23 ft (7 m) long with a longest span of 22 ft (6.8 m) and a deck 28 ft wide.

Who owns 8th Street over Canal No 2?

It is owned by the Town or Township Highway Agency.