I-25 Service Road over South Fork Powder River
FairPosted for loadJohnson County, Wyoming · Wyo 387 JCT - Buffalo · Structure no. AJX
- Built
- 1932
- 93 years old
- Condition
- Fair
- inspected May 2023
- Type
- Truss - Deck
- Steel Continuous
- Length
- 309 ft
- 3 main spans
- Daily traffic
- 79
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Service Road over South Fork Powder River is a steel continuous truss - deck carrying I-25 Service Road over South Fork Powder River in Johnson County, Wyoming. It was built in 1932, so it is 93 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 79 vehicles a day, roughly 28% of them trucks, projected to reach 111 by 2043. The structure is 309 ft (94.1 m) long and 22 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Service Road over South Fork Powder River built?
It was built in 1932, making it 93 years old in 2025.
What condition is I-25 Service Road over South Fork Powder River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does I-25 Service Road over South Fork Powder River carry?
About 79 vehicles per day (2024 count), of which roughly 28% are trucks.
How long is I-25 Service Road over South Fork Powder River?
The structure is 309 ft (94.1 m) long with a longest span of 144 ft (43.9 m) and a deck 22 ft wide.
Who owns I-25 Service Road over South Fork Powder River?
It is owned by the State Highway Agency.