US Bridges

I 64 East Bound over County Route 2

Good

Wayne County, West Virginia · 0.29 Mile East of US 52 · Structure no. 00000000050A246

Built
2021
4 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
170 ft
2 main spans
Daily traffic
18,900
2022 count
Owner
State
State Highway Agency

About this bridge

I 64 East Bound over County Route 2 is a steel continuous stringer/multi-beam or girder carrying I 64 East Bound over County Route 2 in Wayne County, West Virginia. It was built in 2021, so it is 4 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,900 vehicles a day, roughly 23% of them trucks, projected to reach 27,027 by 2042. The structure is 170 ft (51.7 m) long and 42 ft wide.

CarriesI 64 East Bound
CrossesCounty Route 2
Location0.29 Mile East of US 52
RouteInterstate 6400
Coordinates38.39022, -82.5649
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating39 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadHL 93
Structure length170 ft (51.7 m)
Longest span77 ft (23.4 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,900 (2022)
Projected traffic27,027 by 2042
Trucks23%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 64 East Bound over County Route 2 built?

It was built in 2021, making it 4 years old in 2025.

What condition is I 64 East Bound over County Route 2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does I 64 East Bound over County Route 2 carry?

About 18,900 vehicles per day (2022 count), of which roughly 23% are trucks.

How long is I 64 East Bound over County Route 2?

The structure is 170 ft (51.7 m) long with a longest span of 77 ft (23.4 m) and a deck 42 ft wide.

Who owns I 64 East Bound over County Route 2?

It is owned by the State Highway Agency.