US Bridges

Marion CO Rt 33/8 over Whiteday Creek

Good

Marion County, West Virginia · 0.11 M North CR 33/7 · Structure no. 00000000025A080

Built
1992
33 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
10
2022 count
Owner
State
State Highway Agency

About this bridge

Marion CO Rt 33/8 over Whiteday Creek is a prestressed concrete box beam or girders - multiple carrying Marion CO Rt 33/8 over Whiteday Creek in Marion County, West Virginia. It was built in 1992, so it is 33 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 16 by 2041. The structure is 52 ft (15.8 m) long and 15 ft wide.

CarriesMarion CO Rt 33/8
CrossesWhiteday Creek
Location0.11 M North CR 33/7
RouteCounty Highway 3308
Coordinates39.48064, -79.99013
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating98 US tons
Inventory rating71 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length52 ft (15.8 m)
Longest span48 ft (14.6 m)
Deck width15 ft (4.6 m)
Roadway width15 ft (4.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2022)
Projected traffic16 by 2041
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marion CO Rt 33/8 over Whiteday Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is Marion CO Rt 33/8 over Whiteday Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Marion CO Rt 33/8 over Whiteday Creek carry?

About 10 vehicles per day (2022 count).

How long is Marion CO Rt 33/8 over Whiteday Creek?

The structure is 52 ft (15.8 m) long with a longest span of 48 ft (14.6 m) and a deck 15 ft wide.

Who owns Marion CO Rt 33/8 over Whiteday Creek?

It is owned by the State Highway Agency.