US Bridges

Marion County 84 over Prickett Creek

Good

Marion County, West Virginia · 0.02 MI East CO Rt 80 · Structure no. 00000000025A155

Built
1989
36 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
32 ft
1 main span
Daily traffic
50
2019 count
Owner
State
State Highway Agency

About this bridge

Marion County 84 over Prickett Creek is a prestressed concrete box beam or girders - multiple carrying Marion County 84 over Prickett Creek in Marion County, West Virginia. It was built in 1989, so it is 36 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2041. The structure is 32 ft (9.9 m) long and 15 ft wide.

CarriesMarion County 84
CrossesPrickett Creek
Location0.02 MI East CO Rt 80
RouteCounty Highway 8400
Coordinates39.44164, -80.04405
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating98 US tons
Inventory rating73 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length32 ft (9.9 m)
Longest span31 ft (9.4 m)
Deck width15 ft (4.6 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2019)
Projected traffic75 by 2041
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marion County 84 over Prickett Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is Marion County 84 over Prickett Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Marion County 84 over Prickett Creek carry?

About 50 vehicles per day (2019 count).

How long is Marion County 84 over Prickett Creek?

The structure is 32 ft (9.9 m) long with a longest span of 31 ft (9.4 m) and a deck 15 ft wide.

Who owns Marion County 84 over Prickett Creek?

It is owned by the State Highway Agency.