US Bridges

County Route 119/1 over Leading Creek

Good

Lewis County, West Virginia · 0.01 MI E of US 33 · Structure no. 00000000021A201

Built
2010
15 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
203 ft
2 main spans
Daily traffic
50
2018 count
Owner
State
State Highway Agency

About this bridge

County Route 119/1 over Leading Creek is a steel continuous stringer/multi-beam or girder carrying County Route 119/1 over Leading Creek in Lewis County, West Virginia. It was built in 2010, so it is 15 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 58 by 2038. The structure is 203 ft (61.9 m) long and 25 ft wide.

CarriesCounty Route 119/1
CrossesLeading Creek
Location0.01 MI E of US 33
RouteCounty Highway 11901
Coordinates39.01277, -80.70372
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating65 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length203 ft (61.9 m)
Longest span100 ft (30.5 m)
Deck width25 ft (7.5 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2018)
Projected traffic58 by 2038
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Route 119/1 over Leading Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is County Route 119/1 over Leading Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does County Route 119/1 over Leading Creek carry?

About 50 vehicles per day (2018 count), of which roughly 8% are trucks.

How long is County Route 119/1 over Leading Creek?

The structure is 203 ft (61.9 m) long with a longest span of 100 ft (30.5 m) and a deck 25 ft wide.

Who owns County Route 119/1 over Leading Creek?

It is owned by the State Highway Agency.