County Route 119/3 over Leading Creek
FairLewis County, West Virginia · 0.05 MI S of US Rt 33 F · Structure no. 00000000021A135
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 10
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 119/3 over Leading Creek is a steel stringer/multi-beam or girder carrying County Route 119/3 over Leading Creek in Lewis County, West Virginia. It was built in 1981, so it is 44 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 13 by 2038. The structure is 40 ft (12.3 m) long and 15 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 119/3 over Leading Creek built?
It was built in 1981, making it 44 years old in 2025.
What condition is County Route 119/3 over Leading Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does County Route 119/3 over Leading Creek carry?
About 10 vehicles per day (2018 count), of which roughly 10% are trucks.
How long is County Route 119/3 over Leading Creek?
The structure is 40 ft (12.3 m) long with a longest span of 39 ft (11.8 m) and a deck 15 ft wide.
Who owns County Route 119/3 over Leading Creek?
It is owned by the State Highway Agency.