US Bridges

County Route 87/19 over Isaacs Run

Good

Jackson County, West Virginia · 0.01 Mile East of Wv 87 · Structure no. 00000000018A224

Built
1999
26 years old
Condition
Good
inspected January 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
20
2019 count
Owner
State
State Highway Agency

About this bridge

County Route 87/19 over Isaacs Run is a prestressed concrete box beam or girders - multiple carrying County Route 87/19 over Isaacs Run in Jackson County, West Virginia. It was built in 1999, so it is 26 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, projected to reach 29 by 2039. The structure is 50 ft (15.1 m) long and 31 ft wide.

CarriesCounty Route 87/19
CrossesIsaacs Run
Location0.01 Mile East of Wv 87
RouteCounty Highway 8719
Coordinates38.81371, -81.79015
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87 US tons
Inventory rating52 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length50 ft (15.1 m)
Longest span46 ft (14 m)
Deck width31 ft (9.3 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2019)
Projected traffic29 by 2039
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$650,000
NavigationNo navigation control on waterway

Frequently asked questions

When was County Route 87/19 over Isaacs Run built?

It was built in 1999, making it 26 years old in 2025.

What condition is County Route 87/19 over Isaacs Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does County Route 87/19 over Isaacs Run carry?

About 20 vehicles per day (2019 count).

How long is County Route 87/19 over Isaacs Run?

The structure is 50 ft (15.1 m) long with a longest span of 46 ft (14 m) and a deck 31 ft wide.

Who owns County Route 87/19 over Isaacs Run?

It is owned by the State Highway Agency.