US Bridges

County Route 30 over Isaacs Run

Good

Jackson County, West Virginia · 0.22 Mile East of Wv 87 · Structure no. 00000000018A217

Built
1997
28 years old
Condition
Good
inspected February 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
750
2018 count
Owner
State
State Highway Agency

About this bridge

County Route 30 over Isaacs Run is a prestressed concrete box beam or girders - multiple carrying County Route 30 over Isaacs Run in Jackson County, West Virginia. It was built in 1997, so it is 28 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 750 vehicles a day, roughly 6% of them trucks, projected to reach 945 by 2038. The structure is 40 ft (12.1 m) long and 25 ft wide.

CarriesCounty Route 30
CrossesIsaacs Run
Location0.22 Mile East of Wv 87
RouteCounty Highway 30
Coordinates38.81269, -81.78809
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating56 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length40 ft (12.1 m)
Longest span34 ft (10.4 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic750 (2018)
Projected traffic945 by 2038
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Route 30 over Isaacs Run built?

It was built in 1997, making it 28 years old in 2025.

What condition is County Route 30 over Isaacs Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does County Route 30 over Isaacs Run carry?

About 750 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is County Route 30 over Isaacs Run?

The structure is 40 ft (12.1 m) long with a longest span of 34 ft (10.4 m) and a deck 25 ft wide.

Who owns County Route 30 over Isaacs Run?

It is owned by the State Highway Agency.