US Bridges

IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB

Good

Winnebago County, Wisconsin · Ush 10/STH 441/IH 41 Inte · Structure no. B70040600000000

Built
2018
7 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
951 ft
9 main spans
Daily traffic
8,700
2022 count
Owner
State
State Highway Agency

About this bridge

IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB is a prestressed concrete stringer/multi-beam or girder carrying IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB in Winnebago County, Wisconsin. It was built in 2018, so it is 7 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,700 vehicles a day, projected to reach 10,920 by 2043. The structure is 951 ft (290 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIH Ush 10 Wb/Sth 4
CrossesIH Ush 10 EB to IH 41 NB
LocationUsh 10/STH 441/IH 41 Inte
RouteInterstate 41
Coordinates44.21865, -88.46806
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.1 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans9
Design loadHL 93
Structure length951 ft (290 m)
Longest span115 ft (35.1 m)
Deck width29 ft (8.8 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,700 (2022)
Projected traffic10,920 by 2043
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$5.5 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB built?

It was built in 2018, making it 7 years old in 2025.

What condition is IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB carry?

About 8,700 vehicles per day (2022 count).

How long is IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB?

The structure is 951 ft (290 m) long with a longest span of 115 ft (35.1 m) and a deck 29 ft wide.

Who owns IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB?

It is owned by the State Highway Agency.