IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB
GoodWinnebago County, Wisconsin · Ush 10/STH 441/IH 41 Inte · Structure no. B70040600000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 951 ft
- 9 main spans
- Daily traffic
- 8,700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB is a prestressed concrete stringer/multi-beam or girder carrying IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB in Winnebago County, Wisconsin. It was built in 2018, so it is 7 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,700 vehicles a day, projected to reach 10,920 by 2043. The structure is 951 ft (290 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB built?
It was built in 2018, making it 7 years old in 2025.
What condition is IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB carry?
About 8,700 vehicles per day (2022 count).
How long is IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB?
The structure is 951 ft (290 m) long with a longest span of 115 ft (35.1 m) and a deck 29 ft wide.
Who owns IH Ush 10 Wb/Sth 4 over IH Ush 10 EB to IH 41 NB?
It is owned by the State Highway Agency.