IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra
GoodWinnebago County, Wisconsin · IH 41/STH 441/USH 10 Inte · Structure no. B70040200000000
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 503 ft
- 6 main spans
- Daily traffic
- 16,900
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra is a prestressed concrete stringer/multi-beam or girder carrying IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra in Winnebago County, Wisconsin. It was built in 2015, so it is 10 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,900 vehicles a day, projected to reach 19,000 by 2042. The structure is 503 ft (153.2 m) long and 43 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra built?
It was built in 2015, making it 10 years old in 2025.
What condition is IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra carry?
About 16,900 vehicles per day (2021 count).
How long is IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra?
The structure is 503 ft (153.2 m) long with a longest span of 95 ft (29 m) and a deck 43 ft wide.
Who owns IH 41 NB Off Ramp over Ush 10 EB to IH 41 NB Ra?
It is owned by the State Highway Agency.