US Bridges

Sth 145 over IH 41

Good

Washington County, Wisconsin · 0.5 MI N JCT Ush 45 · Structure no. B66003800000000

Built
1975
50 years old, rebuilt 2009
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
254 ft
2 main spans
Daily traffic
5,000
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 145 over IH 41 is a steel continuous stringer/multi-beam or girder carrying Sth 145 over IH 41 in Washington County, Wisconsin. It was built in 1975 and reconstructed in 2009, so it is 50 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 8% of them trucks, projected to reach 6,480 by 2042. The structure is 254 ft (77.3 m) long and 76 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSth 145
CrossesIH 41
Location0.5 MI N JCT Ush 45
RouteState Highway 145
Coordinates43.28186, -88.19493
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.4 US tons
Inventory rating32.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length254 ft (77.3 m)
Longest span127 ft (38.7 m)
Deck width76 ft (23.3 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2022)
Projected traffic6,480 by 2042
Trucks8%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sth 145 over IH 41 built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2009.

What condition is Sth 145 over IH 41 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Sth 145 over IH 41 carry?

About 5,000 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Sth 145 over IH 41?

The structure is 254 ft (77.3 m) long with a longest span of 127 ft (38.7 m) and a deck 76 ft wide.

Who owns Sth 145 over IH 41?

It is owned by the State Highway Agency.