Ush 45 SB over IH 41
FairWashington County, Wisconsin · 0.6 MI S JCT Sth 145 · Structure no. B66003700000000
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 453 ft
- 4 main spans
- Daily traffic
- 17,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ush 45 SB over IH 41 is a steel continuous stringer/multi-beam or girder carrying Ush 45 SB over IH 41 in Washington County, Wisconsin. It was built in 1975, so it is 50 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,500 vehicles a day, roughly 7% of them trucks, projected to reach 17,332 by 2042. The structure is 453 ft (138 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ush 45 SB over IH 41 built?
It was built in 1975, making it 50 years old in 2025.
What condition is Ush 45 SB over IH 41 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Ush 45 SB over IH 41 carry?
About 17,500 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Ush 45 SB over IH 41?
The structure is 453 ft (138 m) long with a longest span of 150 ft (45.6 m) and a deck 44 ft wide.
Who owns Ush 45 SB over IH 41?
It is owned by the State Highway Agency.