US Bridges

Cth T over IH 94

Good

St. Croix County, Wisconsin · 1.4 M S JCT Cth J · Structure no. B55026000000000

Built
2016
9 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
252 ft
2 main spans
Daily traffic
3,800
2022 count
Owner
State
State Highway Agency

About this bridge

Cth T over IH 94 is a prestressed concrete stringer/multi-beam or girder carrying Cth T over IH 94 in St. Croix County, Wisconsin. It was built in 2016, so it is 9 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,800 vehicles a day, roughly 12% of them trucks, projected to reach 4,320 by 2043. The structure is 252 ft (76.7 m) long and 58 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesCth T
CrossesIH 94
Location1.4 M S JCT Cth J
RouteCounty Highway 0T
Coordinates44.9422, -92.43565
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.7 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length252 ft (76.7 m)
Longest span124 ft (37.8 m)
Deck width58 ft (17.7 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,800 (2022)
Projected traffic4,320 by 2043
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cth T over IH 94 built?

It was built in 2016, making it 9 years old in 2025.

What condition is Cth T over IH 94 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Cth T over IH 94 carry?

About 3,800 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Cth T over IH 94?

The structure is 252 ft (76.7 m) long with a longest span of 124 ft (37.8 m) and a deck 58 ft wide.

Who owns Cth T over IH 94?

It is owned by the State Highway Agency.