US Bridges

IH 94 EB over Rush River

Good

St. Croix County, Wisconsin · 2.3M E JCT Cth T to N · Structure no. B55026300000000

Built
2023
2 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
18,550
2023 count
Owner
State
State Highway Agency

About this bridge

IH 94 EB over Rush River is a prestressed concrete stringer/multi-beam or girder carrying IH 94 EB over Rush River in St. Croix County, Wisconsin. It was built in 2023, so it is 2 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,550 vehicles a day, projected to reach 22,800 by 2042. The structure is 130 ft (39.6 m) long and 63 ft wide.

CarriesIH 94 EB
CrossesRush River
Location2.3M E JCT Cth T to N
RouteInterstate 94
Coordinates44.94057, -92.39168
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.5 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length130 ft (39.6 m)
Longest span124 ft (37.8 m)
Deck width63 ft (19.2 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,550 (2023)
Projected traffic22,800 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 94 EB over Rush River built?

It was built in 2023, making it 2 years old in 2025.

What condition is IH 94 EB over Rush River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does IH 94 EB over Rush River carry?

About 18,550 vehicles per day (2023 count).

How long is IH 94 EB over Rush River?

The structure is 130 ft (39.6 m) long with a longest span of 124 ft (37.8 m) and a deck 63 ft wide.

Who owns IH 94 EB over Rush River?

It is owned by the State Highway Agency.