US Bridges

Lrd Seminary ST over Pine River

Good

Richland County, Wisconsin · 0.2M W JCT Ush 14 · Structure no. B52019800000000

Built
1993
32 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete Continuous
Length
31 ft
3 main spans
Daily traffic
3,700
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Seminary ST over Pine River is a concrete continuous culvert carrying Lrd Seminary ST over Pine River in Richland County, Wisconsin. It was built in 1993, so it is 32 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,700 vehicles a day, roughly 5% of them trucks, projected to reach 4,440 by 2042. The structure is 31 ft (9.6 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesLrd Seminary ST
CrossesPine River
Location0.2M W JCT Ush 14
RouteCity Street 0
Coordinates43.33472, -90.39056
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length31 ft (9.6 m)
Longest span10 ft (2.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,700 (2022)
Projected traffic4,440 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Seminary ST over Pine River built?

It was built in 1993, making it 32 years old in 2025.

What condition is Lrd Seminary ST over Pine River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Lrd Seminary ST over Pine River carry?

About 3,700 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Lrd Seminary ST over Pine River?

The structure is 31 ft (9.6 m) long with a longest span of 10 ft (2.9 m).

Who owns Lrd Seminary ST over Pine River?

It is owned by the City or Municipal Highway Agency.