Sth 80-MAIN ST over Pine River
GoodRichland County, Wisconsin · 0.8M N JCT Cth Oo · Structure no. B52016600000000
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 200 ft
- 3 main spans
- Daily traffic
- 5,200
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 80-MAIN ST over Pine River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 80-MAIN ST over Pine River in Richland County, Wisconsin. It was built in 1993, so it is 32 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,200 vehicles a day, roughly 4% of them trucks, projected to reach 6,240 by 2042. The structure is 200 ft (60.9 m) long and 61 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 80-MAIN ST over Pine River built?
It was built in 1993, making it 32 years old in 2025.
What condition is Sth 80-MAIN ST over Pine River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Sth 80-MAIN ST over Pine River carry?
About 5,200 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is Sth 80-MAIN ST over Pine River?
The structure is 200 ft (60.9 m) long with a longest span of 67 ft (20.3 m) and a deck 61 ft wide.
Who owns Sth 80-MAIN ST over Pine River?
It is owned by the State Highway Agency.