IH 41 Sb/Ih 94 EB over Cth K
GoodRacine County, Wisconsin · 2.0 MI S JCT Cth G · Structure no. B51013600000000
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected September 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 192 ft
- 2 main spans
- Daily traffic
- 50,500
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH 41 Sb/Ih 94 EB over Cth K is a prestressed concrete continuous stringer/multi-beam or girder carrying IH 41 Sb/Ih 94 EB over Cth K in Racine County, Wisconsin. It was built in 2019, so it is 6 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50,500 vehicles a day, roughly 17% of them trucks, projected to reach 60,600 by 2041. The structure is 192 ft (58.4 m) long and 75 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 41 Sb/Ih 94 EB over Cth K built?
It was built in 2019, making it 6 years old in 2025.
What condition is IH 41 Sb/Ih 94 EB over Cth K in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.
How much traffic does IH 41 Sb/Ih 94 EB over Cth K carry?
About 50,500 vehicles per day (2021 count), of which roughly 17% are trucks.
How long is IH 41 Sb/Ih 94 EB over Cth K?
The structure is 192 ft (58.4 m) long with a longest span of 94 ft (28.5 m) and a deck 75 ft wide.
Who owns IH 41 Sb/Ih 94 EB over Cth K?
It is owned by the State Highway Agency.