US Bridges

Lrd Two Mile Road over E Br Root Vier Canal

Good

Racine County, Wisconsin · 2.4 M E Jct. Cth U · Structure no. B51011000000000

Built
2004
21 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
931
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Two Mile Road over E Br Root Vier Canal is a concrete slab carrying Lrd Two Mile Road over E Br Root Vier Canal in Racine County, Wisconsin. It was built in 2004, so it is 21 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 931 vehicles a day, roughly 10% of them trucks, projected to reach 1,024 by 2043. The structure is 38 ft (11.7 m) long and 32 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesLrd Two Mile Road
CrossesE Br Root Vier Canal
Location2.4 M E Jct. Cth U
RouteCity Street 0
Coordinates42.75706, -87.96864
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.5 US tons
Inventory rating41.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length38 ft (11.7 m)
Longest span36 ft (11 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic931 (2022)
Projected traffic1,024 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Two Mile Road over E Br Root Vier Canal built?

It was built in 2004, making it 21 years old in 2025.

What condition is Lrd Two Mile Road over E Br Root Vier Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Lrd Two Mile Road over E Br Root Vier Canal carry?

About 931 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Lrd Two Mile Road over E Br Root Vier Canal?

The structure is 38 ft (11.7 m) long with a longest span of 36 ft (11 m) and a deck 32 ft wide.

Who owns Lrd Two Mile Road over E Br Root Vier Canal?

It is owned by the City or Municipal Highway Agency.