US Bridges

Lrd 107th ST over Sth 145

Fair

Milwaukee County, Wisconsin · 0.2M S JCT Good Hope RD · Structure no. B40100400000000

Built
2022
3 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
197 ft
2 main spans
Daily traffic
8,700
2023 count
Owner
State
State Highway Agency

About this bridge

Lrd 107th ST over Sth 145 is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd 107th ST over Sth 145 in Milwaukee County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,700 vehicles a day, projected to reach 11,500 by 2043. The structure is 197 ft (60 m) long and 62 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd 107th ST
CrossesSth 145
Location0.2M S JCT Good Hope RD
RouteCity Street 0
Coordinates43.14408, -88.04511
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.1 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length197 ft (60 m)
Longest span96 ft (29.3 m)
Deck width62 ft (19 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,700 (2023)
Projected traffic11,500 by 2043
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lrd 107th ST over Sth 145 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Lrd 107th ST over Sth 145 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Lrd 107th ST over Sth 145 carry?

About 8,700 vehicles per day (2023 count).

How long is Lrd 107th ST over Sth 145?

The structure is 197 ft (60 m) long with a longest span of 96 ft (29.3 m) and a deck 62 ft wide.

Who owns Lrd 107th ST over Sth 145?

It is owned by the State Highway Agency.