Cth Pp EB - W Good over Sth 145
FairMilwaukee County, Wisconsin · 2.3 MI W JCT Sth 181 · Structure no. B40025000000000
- Built
- 1964
- 61 years old, rebuilt 1984
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 226 ft
- 4 main spans
- Daily traffic
- 20,250
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Cth Pp EB - W Good over Sth 145 is a steel stringer/multi-beam or girder carrying Cth Pp EB - W Good over Sth 145 in Milwaukee County, Wisconsin. It was built in 1964 and reconstructed in 1984, so it is 61 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20,250 vehicles a day, projected to reach 20,250 by 2043. The structure is 226 ft (69 m) long and 50 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth Pp EB - W Good over Sth 145 built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1984.
What condition is Cth Pp EB - W Good over Sth 145 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Cth Pp EB - W Good over Sth 145 carry?
About 20,250 vehicles per day (2022 count).
How long is Cth Pp EB - W Good over Sth 145?
The structure is 226 ft (69 m) long with a longest span of 77 ft (23.5 m) and a deck 50 ft wide.
Who owns Cth Pp EB - W Good over Sth 145?
It is owned by the State Highway Agency.