US Bridges

IH 94 EB over Hank Aaron State Trail

Good

Milwaukee County, Wisconsin · 2.6 M E JCT Cth O/Moorlan · Structure no. B40087000000000

Built
2016
9 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
338 ft
3 main spans
Daily traffic
67,000
2021 count
Owner
State
State Highway Agency

About this bridge

IH 94 EB over Hank Aaron State Trail is a prestressed concrete continuous stringer/multi-beam or girder carrying IH 94 EB over Hank Aaron State Trail in Milwaukee County, Wisconsin. It was built in 2016, so it is 9 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 67,000 vehicles a day, projected to reach 88,900 by 2043. The structure is 338 ft (103 m) long and 95 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 94 EB
CrossesHank Aaron State Trail
Location2.6 M E JCT Cth O/Moorlan
RouteInterstate 94
Coordinates43.0309, -88.05665
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating45.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length338 ft (103 m)
Longest span125 ft (38.2 m)
Deck width95 ft (28.9 m)
Roadway width92 ft (28 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic67,000 (2021)
Projected traffic88,900 by 2043
Trucks0%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 94 EB over Hank Aaron State Trail built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH 94 EB over Hank Aaron State Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does IH 94 EB over Hank Aaron State Trail carry?

About 67,000 vehicles per day (2021 count).

How long is IH 94 EB over Hank Aaron State Trail?

The structure is 338 ft (103 m) long with a longest span of 125 ft (38.2 m) and a deck 95 ft wide.

Who owns IH 94 EB over Hank Aaron State Trail?

It is owned by the State Highway Agency.