US Bridges

IH 94 WB over Hank Aaron State Trail

Good

Milwaukee County, Wisconsin · 0.5 M W JCT Sth 100 · Structure no. B40086900000000

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
320 ft
3 main spans
Daily traffic
68,500
2022 count
Owner
State
State Highway Agency

About this bridge

IH 94 WB over Hank Aaron State Trail is a prestressed concrete continuous stringer/multi-beam or girder carrying IH 94 WB over Hank Aaron State Trail in Milwaukee County, Wisconsin. It was built in 2017, so it is 8 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 68,500 vehicles a day, projected to reach 82,200 by 2042. The structure is 320 ft (97.5 m) long and 95 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 94 WB
CrossesHank Aaron State Trail
Location0.5 M W JCT Sth 100
RouteInterstate 94
Coordinates43.03142, -88.0569
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length320 ft (97.5 m)
Longest span119 ft (36.2 m)
Deck width95 ft (28.9 m)
Roadway width92 ft (28 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic68,500 (2022)
Projected traffic82,200 by 2042
Trucks0%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 94 WB over Hank Aaron State Trail built?

It was built in 2017, making it 8 years old in 2025.

What condition is IH 94 WB over Hank Aaron State Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does IH 94 WB over Hank Aaron State Trail carry?

About 68,500 vehicles per day (2022 count).

How long is IH 94 WB over Hank Aaron State Trail?

The structure is 320 ft (97.5 m) long with a longest span of 119 ft (36.2 m) and a deck 95 ft wide.

Who owns IH 94 WB over Hank Aaron State Trail?

It is owned by the State Highway Agency.