Lrd High Falls Roa over Peshtigo River
GoodMarinette County, Wisconsin · 3.2M N JCT Cth W · Structure no. B38002700000000
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 144 ft
- 2 main spans
- Daily traffic
- 130
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd High Falls Roa over Peshtigo River is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd High Falls Roa over Peshtigo River in Marinette County, Wisconsin. It was built in 1986, so it is 39 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 130 vehicles a day, projected to reach 143 by 2043. The structure is 144 ft (43.8 m) long and 26 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd High Falls Roa over Peshtigo River built?
It was built in 1986, making it 39 years old in 2025.
What condition is Lrd High Falls Roa over Peshtigo River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Lrd High Falls Roa over Peshtigo River carry?
About 130 vehicles per day (2024 count).
How long is Lrd High Falls Roa over Peshtigo River?
The structure is 144 ft (43.8 m) long with a longest span of 70 ft (21.3 m) and a deck 26 ft wide.
Who owns Lrd High Falls Roa over Peshtigo River?
It is owned by the Town or Township Highway Agency.