Lrd Parkway RD over Peshtigo River
FairPosted for loadMarinette County, Wisconsin · 4.3M N JCT Cth X · Structure no. B38000900000000
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Concrete Continuous
- Length
- 88 ft
- 3 main spans
- Daily traffic
- 351
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Parkway RD over Peshtigo River is a concrete continuous slab carrying Lrd Parkway RD over Peshtigo River in Marinette County, Wisconsin. It was built in 1960, so it is 65 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 351 vehicles a day, projected to reach 386 by 2043. The structure is 88 ft (26.7 m) long and 29 ft wide. If it were closed, the detour would be 15.5 mi (25 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Parkway RD over Peshtigo River built?
It was built in 1960, making it 65 years old in 2025.
What condition is Lrd Parkway RD over Peshtigo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Lrd Parkway RD over Peshtigo River carry?
About 351 vehicles per day (2024 count).
How long is Lrd Parkway RD over Peshtigo River?
The structure is 88 ft (26.7 m) long with a longest span of 33 ft (10.1 m) and a deck 29 ft wide.
Who owns Lrd Parkway RD over Peshtigo River?
It is owned by the Town or Township Highway Agency.