US Bridges

Cth D over Halfway Creek

Good

La Crosse County, Wisconsin · 0.3 Miles N of Junction W · Structure no. B32024000000000

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete Continuous
Length
76 ft
2 main spans
Daily traffic
1,170
2022 count
Owner
County
County Highway Agency

About this bridge

Cth D over Halfway Creek is a concrete continuous slab carrying Cth D over Halfway Creek in La Crosse County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,170 vehicles a day, roughly 5% of them trucks, projected to reach 1,580 by 2042. The structure is 76 ft (23.3 m) long and 37 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesCth D
CrossesHalfway Creek
Location0.3 Miles N of Junction W
RouteCounty Highway 0
Coordinates43.97213, -91.21061
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length76 ft (23.3 m)
Longest span37 ft (11.3 m)
Deck width37 ft (11.2 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,170 (2022)
Projected traffic1,580 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth D over Halfway Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Cth D over Halfway Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Cth D over Halfway Creek carry?

About 1,170 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Cth D over Halfway Creek?

The structure is 76 ft (23.3 m) long with a longest span of 37 ft (11.3 m) and a deck 37 ft wide.

Who owns Cth D over Halfway Creek?

It is owned by the County Highway Agency.