Cth Dh Main ST over Halfway Creek
FairLa Crosse County, Wisconsin · 0.1M S JCT Cth V · Structure no. B32016100000000
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 94 ft
- 1 main span
- Daily traffic
- 8,200
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Cth Dh Main ST over Halfway Creek is a prestressed concrete stringer/multi-beam or girder carrying Cth Dh Main ST over Halfway Creek in La Crosse County, Wisconsin. It was built in 1991, so it is 34 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,200 vehicles a day, roughly 6% of them trucks, projected to reach 7,296 by 2042. The structure is 94 ft (28.5 m) long and 56 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth Dh Main ST over Halfway Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is Cth Dh Main ST over Halfway Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Cth Dh Main ST over Halfway Creek carry?
About 8,200 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Cth Dh Main ST over Halfway Creek?
The structure is 94 ft (28.5 m) long with a longest span of 90 ft (27.4 m) and a deck 56 ft wide.
Who owns Cth Dh Main ST over Halfway Creek?
It is owned by the City or Municipal Highway Agency.