Lrd Maple/Oregon S over Sturgeon Bay
GoodDoor County, Wisconsin · 1.0M N JCT Sth 42 · Structure no. B15002300030000
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 278 ft
- 3 main spans
- Daily traffic
- 5,700
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd Maple/Oregon S over Sturgeon Bay is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd Maple/Oregon S over Sturgeon Bay in Door County, Wisconsin. It was built in 2008, so it is 17 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,700 vehicles a day, projected to reach 7,530 by 2042. The structure is 278 ft (84.7 m) long and 48 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Maple/Oregon S over Sturgeon Bay built?
It was built in 2008, making it 17 years old in 2025.
What condition is Lrd Maple/Oregon S over Sturgeon Bay in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Lrd Maple/Oregon S over Sturgeon Bay carry?
About 5,700 vehicles per day (2021 count).
How long is Lrd Maple/Oregon S over Sturgeon Bay?
The structure is 278 ft (84.7 m) long with a longest span of 93 ft (28.3 m) and a deck 48 ft wide.
Who owns Lrd Maple/Oregon S over Sturgeon Bay?
It is owned by the State Highway Agency.