Lrd Maple/Oregon S over Sturgeon Bay
FairDoor County, Wisconsin · 1.0M N JCT Sth 42 · Structure no. B15002300020000
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected April 2024
- Type
- Movable - Bascule
- Steel
- Length
- 308 ft
- 1 main span
- Daily traffic
- 6,100
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd Maple/Oregon S over Sturgeon Bay is a steel movable - bascule carrying Lrd Maple/Oregon S over Sturgeon Bay in Door County, Wisconsin. It was built in 2008, so it is 17 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,100 vehicles a day, projected to reach 7,530 by 2043. The structure is 308 ft (93.9 m) long and 48 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Maple/Oregon S over Sturgeon Bay built?
It was built in 2008, making it 17 years old in 2025.
What condition is Lrd Maple/Oregon S over Sturgeon Bay in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Lrd Maple/Oregon S over Sturgeon Bay carry?
About 6,100 vehicles per day (2023 count).
How long is Lrd Maple/Oregon S over Sturgeon Bay?
The structure is 308 ft (93.9 m) long with a longest span of 308 ft (93.9 m) and a deck 48 ft wide.
Who owns Lrd Maple/Oregon S over Sturgeon Bay?
It is owned by the State Highway Agency.